I have my appointment with Lidio at Alternative set for the Saturday the 27th of this month...but I have to get a few things finished before then...
1.) I have to wire the solenoid back up to my n2o system.
2.) I have to run my n2o line from the solenoid to my n2o pressure gauge in the pillar.
3.) I have to wire up my window switch...or pay Lidio $100 to do it. I'd rather do it myself if possible.
4.) Mount my bottle brackets.
5.) I have to put the 100 shot jets in the nozzle.
Anyone wanna take some time out of one of their days and drink my beer?
While I can do most of this shit on my own, an extra set of experience hands will help get this all done sooner, and done right. Thanks to my work schedule (day job and I work at night on the weekends) it may a bit difficult to get some help. If anyone is willing to help, we'd have to do this after 6pm Monday - Thursday or earlier in the day on Saturday or Sunday. Free beer, anyone?